CASE 147

New drive gear waffle oven

The Challenge

  • Premature wear on pressure station bearings
  • Jamming of rollers of chain
  • Wear and tear of sync pins and therefore synchronization problems resulting in quality failure
  • No plans of running gear available
  • Intervention time: 1 week

    The Solution

    • Design and creation of system for reliable synchronisation of running gear for chain
    • Design and manufacture of new waffle iron supports
    • New setup for tensioning station
    • Installation of lubrication system

      Production profits

      • Unnecessary production loss and unnecessary repair costs have been stopped
      • The production profit will increase significantly
      • The 40-year-old oven can continue to be used
      • The R.O.I. of the oven was adjusted significantly positively
      Solving 40 years of problems at a waffle oven of unplanned machine downtimes and quality failure.